Project: Berthoud Bridge
Scope of Services: Demolition
Project Completed: August 2012
Project Description
Alpine Demolition was hired to do the demolition of the former Berthoud Bridge located at the I-25 and Berthoud exit. Alpine used high reach excavators with a hammer to remove the bridge. All the steel from this bridge was recycled. Alpine hit major obstacles with high winds but was able to finish this project on time and within budget.